Records
The AI data centers hub contains three record types:
Data Centers: Core site/campus information—location, chip owner and users, IT power capacity, compute capacity, capital costs, and metadata (sources, methods).
Timelines: Dated milestones and time-series figures for each site—construction status by date, IT power capacity and performance snapshots, costs, and other progress indicators.
Chip quantities: Dated records of the type and number of chips deployed at each site, linked to the corresponding Data Centers and Timelines records.
Fields
We provide a comprehensive guide to the hub’s fields below. Examples are taken from a representative site (e.g., OpenAI Stargate Abilene) unless otherwise indicated. For each Data Center, time-varying metrics (IT power capacity, performance, costs, construction progress) are stored as individual Timelines records.
If you would like to ask any questions about the database, or request a field to be added, contact us at data@epoch.ai.
Table: AI data centers
| Column | Type | Definition | Example value | Coverage |
|---|---|---|---|---|
Name | Text | Name for the site or campus. | OpenAI Stargate Abilene | 100%
96 out of 96 records |
Current H100 equivalents | Link → Timelines | Lookup field to the H100 equivalents field in the Timelines table, containing the most recent value for compute capacity in H100-equivalents based on 8-bit OP/s, as of the current date. | 1018696 | 100%
96 out of 96 records |
Current power (MW) | Link → Timelines | Lookup field to the IT power (MW) field in the Timelines table, containing the most recent value for IT power capacity in megawatts, as of the current date. IT power is the power available to GPU servers, network infrastructure and storage, excluding cooling and other facility overhead. | 824 | 100%
96 out of 96 records |
Current total capital cost (2025 USD billions) | Link → Timelines | Lookup field to Total capital cost (2025 USD billions) in the Timelines table, containing the most recent estimate of total facility capital cost. | 31.214768 | 100%
96 out of 96 records |
Owner | Text with Confidence Signifier | The chip owner: who owns the AI hardware in the data center. This is not necessarily the owner or operator of the facility. Includes signifier indicating confidence of “#confident”, “#likely”, or “#speculative”. | Oracle #confident | 90%
86 out of 96 records |
Users | Text with Confidence Signifier | AI lab(s) using the compute in the data center. Includes confidence signifier. | OpenAI #confident | 74%
71 out of 96 records |
Selected sources | Text | List of the most important sources supporting the data. | 100%
96 out of 96 records | |
Calculations sheet | URL | Link to a spreadsheet which stores the timeline, chip quantities, and cooling quantities data and the calculations behind them. | 100%
96 out of 96 records | |
Project | Text with Confidence Signifier | The broader project that this data center is part of, if applicable. | Stargate #confident | 18%
17 out of 96 records |
Investors | Link (multi → Organizations) | Financial backers tied to the campus/project. | Softbank,OpenAI,Oracle | 10%
10 out of 96 records |
Construction companies | Link (multi → Organizations) | Companies involved in construction of the site. | Mortenson | 6%
6 out of 96 records |
Energy companies | Link (multi → Organizations) | Companies involved with providing power to the site. | American Electric Power | 20%
19 out of 96 records |
Country | Single select | The country that this data center is located in. | United States | 100%
96 out of 96 records |
Address | Text | Street address, based on public records. | 5502 Spinks Rd, Abilene, TX 79601 | 85%
82 out of 96 records |
Table: Timelines
| Column | Type | Definition | Example value | Coverage |
|---|---|---|---|---|
Data center | Link → AI data centers | Link to the record of the data center this timeline corresponds to. | OpenAI Stargate Abilene | 100%
576 out of 576 records |
Date | Date | As-of date for the status/metrics. | 2026-03-24 | 100%
576 out of 576 records |
Construction status | Text | Short description of the construction status at that point in time. | Building 3 and 4 look complete, but are not fully operational. Not as many cars are parked next to it as Building 1-2 which suggests they may still be ramping up. Building 4 was due by now according to a regulatory filing. Building 5 still has light construction activity, while Building 6 still lacks chillers. The on-site power plant to the right of Building 2 looks complete. | 100%
576 out of 576 records |
Buildings operational | Numeric | Count of buildings operational by this date. | 2 | 100%
575 out of 576 records |
IT power (MW) | Numeric | Total IT power capacity in megawatts, including power for GPU servers, network infrastructure and storage. | 206.0 | 100%
576 out of 576 records |
Power (MW) | Numeric (calc/observed) | Total facility power capacity in megawatts, including the IT power and power for cooling, lighting, etc. | 288.0 | 100%
576 out of 576 records |
H100 equivalents | Numeric (calc) | The number of NVIDIA H100 GPUs that are equivalent to this data center’s compute capacity, based on 8-bit OP/s. | 254674 | 99%
573 out of 576 records |
Performance (8-bit OP/s) | Numeric | Maximum compute capacity in any format 8 bits or wider. Estimates usually based on best guesses of what chips would be used at the location and the power estimate to infer the number of these chips. | 5.04e+20 | 99%
573 out of 576 records |
Total capital cost (2025 USD billions) | Numeric | Total capital cost of the entire facility by this date, including IT hardware (such as GPUs), mechanical and electrical equipment, building shell and white space, construction labor, land acquisition, etc. | 7.803692 | 100%
576 out of 576 records |
Compute cost (2025 USD billions) | Numeric | Total capital cost of the IT hardware in the data center buildings. Includes GPUs, networking, server racks, etc. | 5.379277999999999 | 100%
576 out of 576 records |
Construction cost (2025 USD billions) | Numeric | Total of all capital costs other than compute, including building shell and white space, mechanical and electrical, HVAC systems, construction labor, land acquisition, etc. | 2.424414 | 100%
576 out of 576 records |
Annual operating cost (2025 USD billions) | Numeric | Annual total of all operating costs, including energy consumption, taxes, maintenance, labor, and water. | 0.185812 | 100%
576 out of 576 records |
Water use (MGD) | Numeric | Estimated average water consumed by the data center in million gallons/day. | 15%
84 out of 576 records | |
Current H100 equivalents | Number | Lookup to the current number of H100 equivalents for the data center as of today. Used to group and sort the table. | 1018696 | 100%
576 out of 576 records |
Table: Chip quantities
| Column | Type | Definition | Example value | Coverage |
|---|---|---|---|---|
Handle | Text | Identifies the record via the chip type, data center, and date. | B300 at OpenAI Stargate Abilene on 2026-05-23T00:00:00.000Z | 100%
248 out of 248 records |
Date | Date | As-of date for the metrics. | 2026-05-23 | 100%
248 out of 248 records |
Chip type | Link → Chip types | The type of chip deployed in the data center. Links to the Chip types table from the Chip Sales dataset. | B300 | 100%
248 out of 248 records |
Number of Units | Number | The number of chips of the given type that are deployed in the data center as of this date. Note that for each data center, the chip quantities implicitly start at zero, and are implicitly constant until the next record with the same “Chip type” and a later “Date”. | 100,800 | 100%
248 out of 248 records |
Chip type source | Single select | How the chip type was determined: either “Company disclosure”, if the chip type was disclosed by one of the companies involved with the data center, or “Estimate”, if estimated. The estimate is usually based on Chip Sales in the previous quarter, or the chip owner; e.g. if the chip owner is Google then the chip type is likely TPUs. | Estimate | 100%
248 out of 248 records |
Number of Units source | Single select | How the number of units was determined, similar to the “Chip type source” field. If “Estimate”, the estimate is usually based on the IT power of the data center divided by the IT power per chip. | Estimate | 100%
248 out of 248 records |
Owner | Text with Confidence Signifier | The chip owner: who owns these chips on this date. This is not necessarily the owner or operator of the facility. Includes signifier indicating confidence of “#confident”, “#likely”, or “#speculative”. | Oracle #confident | 88%
218 out of 248 records |
User | Text with Confidence Signifier | The user of the chips on this date. Includes signifier indicating confidence of “#confident”, “#likely”, or “#speculative”. | OpenAI #confident | 65%
161 out of 248 records |
Notes | Text | Details on how this chip quantity was found or estimated, and anything else of note. | Building design is the same but the chillers are slightly larger, suggesting the same number of servers but slightly more power per server. This is consistent with B300, as is the timing with B300 chip sales ramping up. | 92%
228 out of 248 records |
Data center | Link → Data centers | A link to the record from the “Data centers” table that this chip quantity applies to. | OpenAI Stargate Abilene | 100%
248 out of 248 records |
Timeline | Link → Timelines | A link to the record from the “Timelines” table that this chip quantity corresponds to. | 2026-05-23 | 100%
248 out of 248 records |