San Antonio, Texas, United States
Vantage TX1 is an operational AI data center hosting an estimated 39k H100-equivalent chips, scaling toward a projected 155k H100-equivalent chips — supported by 32 MW of IT power, rising to 128 MW — at a capital cost of $1.2 B, rising to $4.8 B. We estimate that it uses Nvidia B200 chips. The timeline of IT power and compute capacity is based on satellite imagery, regulatory filings, chip availability, and chip efficiency. Air-quality permits reveal a planned third building (TX13), though there are no signs of construction yet.
Satellite imagery
CURRENT COMPUTE
39k H100-eq
7.66e19 8-bit OP/s
PROJECTED
155k H100-eq
3.06e20 8-bit OP/s
CURRENT IT POWER
32 MW
PROJECTED IT POWER
128 MW
CURRENT COST
$1.2 B
PROJECTED COST
$4.8 B
Land clearing begins for both Building 1 & Building 2
Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source
Estimated construction completion date of Building 2. Construction Project Filing