Vantage TX1 is an operational AI data center hosting an estimated 39k H100-equivalent chips, scaling toward a projected 155k H100-equivalent chips — supported by 32 MW of IT power, rising to 128 MW — at a capital cost of $1.2 B, rising to $4.8 B. We estimate that it uses Nvidia B200 chips. The timeline of IT power and compute capacity is based on satellite imagery, regulatory filings, chip availability, and chip efficiency. Air-quality permits reveal a planned third building (TX13), though there are no signs of construction yet.

STATUS Operational
Show compute as
Satellite view of Vantage TX1

Satellite imagery

Latest: Feb. 7, 2026 · 1 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

39k H100-eq

7.66e19 8-bit OP/s

PROJECTED

155k H100-eq

3.06e20 8-bit OP/s

CURRENT IT POWER

32 MW

PROJECTED IT POWER

128 MW

CURRENT COST

$1.2 B

PROJECTED COST

$4.8 B

HardwareNvidia B200

CoolingAir-cooled chiller

Buildout

Dec 15, 20230K H100e
Dec 15, 2023

Land clearing begins for both Building 1 & Building 2

Feb 15, 2026

Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source

Compute
39kH100-eq
IT Power
32MW
Cost
$1.2B
Aug 31, 2027

Estimated construction completion date of Building 2. Construction Project Filing

Compute
155kH100-eq
IT Power
128MW
Cost
$4.8B

Sources

  1. Construction Permitting for TX11
  2. Construction Permitting for TX12
  3. Air quality permitting that references TX13