Oracle Batam is an operational AI data center with AI chips owned by Oracle (likely). It hosts an estimated 84k H100-equivalents of compute, supported by 72 MW of IT power at a capital cost of $2.7 B. We estimate that it uses Nvidia B200 and Nvidia B300 chips.

The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, company disclosures, chip availability, and chip efficiency.

OWNER Oracle STATUS Operational
Show compute as
Satellite view of Oracle Batam

Satellite imagery

Latest: Apr. 16, 2026 · 4 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

84k H100-eq

1.67e20 8-bit OP/s

CURRENT IT POWER

72 MW

PROJECTED IT POWER

72 MW

CURRENT COST

$2.7 B

PROJECTED COST

$2.7 B

HardwareNvidia B200, Nvidia B300

CoolingEvaporative cooling tower

Buildout

Jul 1, 20220K H100e
Jul 1, 2022

Land clearing begins.

May 15, 2025

Building 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.

Compute
40kH100-eq
IT Power
33MW
Cost
$1.3B
Jun 13, 2025

Building 3 shell is partly built. Building 1 and 2 look complete.

Compute
40kH100-eq
IT Power
33MW
Cost
$1.3B
Oct 1, 2025

Building 3 has cooling towers beginning to be installed.

Compute
40kH100-eq
IT Power
33MW
Cost
$1.3B
Mar 19, 2026

Building 3 looks complete including building shell, chillers and backup generators.

Compute
40kH100-eq
IT Power
33MW
Cost
$1.3B
Apr 17, 2026

Building 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.

Compute
84kH100-eq
IT Power
72MW
Cost
$2.7B
May 6, 2026

The three buildings look unchanged since March.

Compute
84kH100-eq
IT Power
72MW
Cost
$2.7B

Sources

  1. DayOne discloses a partnership with "leading global tech company" at their Batam campus
  2. Oracle announces their Batam cloud compute region
  3. Oracle is later reported to be leasing DayOne data centers in Indonesia
  4. DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement

Read more about our methodology.