Batam, Riau Islands, Indonesia
Oracle Batam is an operational AI data center hosting an estimated 84k H100-equivalent chips — supported by 72 MW of IT power — at a capital cost of $2.7 B. We estimate that it uses Nvidia B200 and Nvidia B300 chips. The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, company disclosures, chip availability, and chip efficiency.
Satellite imagery
CURRENT COMPUTE
84k H100-eq
1.67e20 8-bit OP/s
CURRENT IT POWER
72 MW
PROJECTED IT POWER
72 MW
CURRENT COST
$2.7 B
PROJECTED COST
$2.7 B
Land clearing begins.
Building 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.
Building 3 shell is partly built. Building 1 and 2 look complete.
Building 3 has cooling towers beginning to be installed.
Building 3 looks complete including building shell, chillers and backup generators.
Building 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.
The three buildings look unchanged since March.