20262025202420232022
Oracle BatamBatam, Riau Islands, Indonesia
OWNEROracle
Full details →

CONSTRUCTION STATUS
May 6, 2026

The three buildings look unchanged since March.

Compute
84kH100-eq
IT Power
72MW
Cost
$2.7B
Building
Substation
On-site power
Backup power
Cooling