Vineland, New Jersey, United States
Microsoft-Nebius New Jersey is an operational AI data center with AI chips owned by Nebius and likely used by Microsoft. It hosts an estimated 57k H100-equivalents of compute, supported by 50 MW of IT power at a capital cost of $1.9 B. We estimate that it uses Nvidia B300 chips.
The timeline of IT power and compute capacity is based on satellite imagery, company disclosures, and our cooling equipment power model.

Satellite imagery
CURRENT COMPUTE
57kH100-eq
1.13e208-bit OP/s
CURRENT IT POWER
50MW
PROJECTED IT POWER
50MW
CURRENT COST
$1.9B
PROJECTED COST
$1.9B
Land clearing begins for northern two buildings (Building 1-2).
By mid-December 2025 the building was still not complete. A satellite analysis by SemiAnalysis found that the air-cooled chillers serving the second half of the first 50 MW phase were not yet installed, so the phase was not yet operational. SemiAnalysis estimated the full 50 MW would be reached around January to February 2026.
High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT capacity (70 MW total facility power at a 1.4 PUE), based on DataOne's disclosure of a first 50 MW phase. SemiAnalysis estimated the full 50 MW was reached around January to February 2026 (SemiAnalysis); this April image is our first high-resolution confirmation that the cooling is in place.
Compared with the April 2026 image, the building shell is closer to completion, and several additional air-cooled chillers have appeared on the ground, though they do not yet appear to be connected or operating. We therefore keep IT capacity at 50 MW.