CoreWeave Norway

Øvrebø, Agder, Norway

CoreWeave Norway is an operational AI data center with AI chips owned by CoreWeave and possibly used by OpenAI. It hosts an estimated 51k H100-equivalents of compute, supported by 42 MW of IT power at a capital cost of $1.6 B. We estimate that it uses Nvidia B200 chips.

The timeline of IT power and compute capacity is based on satellite imagery, company disclosures, third-party reporting, our cooling equipment power model, and chip efficiency.

OWNERCoreWeaveSTATUSOperationalUSEROpenAI (speculative)
Show compute as
Satellite view of CoreWeave Norway

Satellite imagery

Latest: Apr. 24, 2026 · 2 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

51kH100-eq

1.00e208-bit OP/s

CURRENT IT POWER

42MW

PROJECTED IT POWER

42MW

CURRENT COST

$1.6B

PROJECTED COST

$1.6B

Buildout

Jan 23, 20240K H100e
Jan 23, 2024

This article from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here.

Jul 27, 2025

Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, Bulk said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave.

Compute
51kH100-eq
IT Power
42MW
Cost
$1.6B
Apr 25, 2026

Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image.

Compute
51kH100-eq
IT Power
42MW
Cost
$1.6B

Sources

  1. CoreWeave/Bulk N01 partnership announcement
  2. Bulk N01 expansion announcement
  3. Bulk N01 campus brochure with 5-data-center plan

Read more about our methodology.