Springfield, Nebraska, United States
Meta Sarpy is an AI Data Center under construction, projected to host an estimated 92k H100-equivalent chips — supported by 80 MW — at a capital cost of $3.0 B. The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, chip availability, and chip efficiency. Sarpy County is powered entirely by renewable energy sourced through Meta’s wind-farm investments in northeast Nebraska and Kansas.
Satellite imagery
CURRENT COMPUTE
0 H100-eq
0 8-bit OP/s
PROJECTED
92k H100-eq
1.82e20 8-bit OP/s
CURRENT IT POWER
0 MW
PROJECTED IT POWER
80 MW
CURRENT COST
$0.0 B
PROJECTED COST
$3.0 B
Building 1 grading underway.
Building 1 shell, electrical and cooling equipment looks complete, with minimal construction work, so we expect it to be operational within 3 months.
Building 1 is operational (estimate).