Rosemount, Minnesota, United States
Meta Rosemount is an operational AI data center with AI chips owned and used by Meta. It hosts an estimated 216k H100-equivalents of AI compute, supported by 178 MW of IT power at a capital cost of $6.7 B. We estimate that it uses Nvidia B200 chips.
The timeline of IT power and AI compute capacity is based on satellite imagery, our cooling equipment power model, structural similarity to known buildings, chip availability, and chip efficiency.
The campus sits on 280 acres of former University of Minnesota UMore Park land.

Satellite imagery
CURRENT COMPUTE
216kH100-eq
4.27e208-bit OP/s
CURRENT IT POWER
178MW
PROJECTED IT POWER
178MW
CURRENT COST
$6.7B
PROJECTED COST
$6.7B
Land is cleared.
Both buildings and their cooling infrastructure look complete, but the site probably is likely still under commissioning, and few cars are parked to the right of Building 1. We give another 3 months before it's operational.
Buildings 1 and 2 are estimated to be operational.
View our calculations for this data center, or read more about our methodology.