Back to Directory
Updated Aug. 24, 2026

Meta-QTS Hillsboro 2

Hillsboro, Oregon, United States

Meta-QTS Hillsboro 2 is an operational AI data center with AI chips likely owned and used by Meta. It hosts an estimated 124k H100-equivalents of compute, supported by 180 MW of IT power at a capital cost of $6.8 B. We estimate that it uses Nvidia H100 chips.

The timeline of IT power and compute capacity is based on satellite imagery, company disclosures, chip availability, and chip efficiency.

The facility is powered in part by the Tower Solar project, a 120 MWac solar installation located west of Boardman, Oregon.

OWNERMeta (likely)STATUSOperationalUSERMeta (likely)
Show compute as
Satellite view of Meta-QTS Hillsboro 2

Satellite imagery

Latest: Apr. 16, 2026 · 5 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

124kH100-eq

2.45e208-bit OP/s

CURRENT IT POWER

180MW

PROJECTED IT POWER

180MW

CURRENT COST

$6.8B

PROJECTED COST

$6.8B

Buildout

Apr 1, 20210K H100e
Apr 1, 2021

First signs of site land clearing appear on satellite imagery.

Apr 29, 2023

Satellite imagery shows Building 3 and 4 cooling start to go on.

Aug 2, 2023

Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of construction equipment on or immediately around the building.

Compute
31kH100-eq
IT Power
45MW
Cost
$1.7B
Nov 8, 2024

We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.

Compute
124kH100-eq
IT Power
180MW
Cost
$6.8B
Apr 14, 2025

All four buildings are operational

Compute
124kH100-eq
IT Power
180MW
Cost
$6.8B
Apr 17, 2026

All four buildings are operational.

Compute
124kH100-eq
IT Power
180MW
Cost
$6.8B

Sources

  1. QTS Hillsboro 2 data center announcement
  2. QTS and Meta sign an agreement with PGE for a 120MWac solar installation

Read more about our methodology.