Kuna, Idaho, United States
Meta Kuna is an operational AI data center with AI chips owned and used by Meta. It hosts an estimated 173k H100-equivalents of compute, supported by 152 MW of IT power at a capital cost of $5.8 B. We estimate that it uses Nvidia B300 chips.
The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, structural similarity to known buildings, chip availability, and chip efficiency.
Satellite imagery
CURRENT COMPUTE
173k H100-eq
3.43e20 8-bit OP/s
CURRENT IT POWER
152 MW
PROJECTED IT POWER
152 MW
CURRENT COST
$5.8 B
PROJECTED COST
$5.8 B
Land clearing begins.
Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buldings to the north. Meta announced the arrival of the first server rack the following week.
Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.