Updated Jul. 28, 2026

Meta Kuna

Kuna, Idaho, United States

Meta Kuna is an operational AI data center with AI chips owned and used by Meta. It hosts an estimated 173k H100-equivalents of compute, supported by 152 MW of IT power at a capital cost of $5.8 B. We estimate that it uses Nvidia B300 chips.

The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, structural similarity to known buildings, chip availability, and chip efficiency.

OWNER Meta STATUS Operational USER Meta
Show compute as
Satellite view of Meta Kuna

Satellite imagery

Latest: Mar. 18, 2026 · 1 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

173k H100-eq

3.43e20 8-bit OP/s

CURRENT IT POWER

152 MW

PROJECTED IT POWER

152 MW

CURRENT COST

$5.8 B

PROJECTED COST

$5.8 B

HardwareNvidia B300

CoolingAir-cooled condenser

Buildout

Oct 3, 20220K H100e
Oct 3, 2022

Land clearing begins.

Mar 15, 2026

Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buldings to the north. Meta announced the arrival of the first server rack the following week.

Jun 1, 2026

Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.

Compute
173kH100-eq
IT Power
152MW
Cost
$5.8B

Sources

  1. Official Pamphlet from Meta
  2. Application for Power Purchase Agreement, Pleasant Valley Solar 1 
  3. Application for Power Purchase Agreement, Pleasant Valley Solar 2
  4. Approval to move start date of Solar 2 to May 31, 2026
  5. Notice of Application for 3rd PPA (Blacks Creek Energy Center)
  6. Idaho Statesman: Peak construction reached in March 2025
  7. Idaho Statesman: Expected water usage reported in 2022

Read more about our methodology.