United States
Meta Gallatin is an operational AI data center hosting an estimated 100k H100-equivalent chips — supported by 87 MW of IT power — at a capital cost of $3.3 B. We estimate that it uses Nvidia B300 chips. The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, chip availability, and chip efficiency.
Satellite imagery
CURRENT COMPUTE
100k H100-eq
1.97e20 8-bit OP/s
CURRENT IT POWER
87 MW
PROJECTED IT POWER
87 MW
CURRENT COST
$3.3 B
PROJECTED COST
$3.3 B
Land clearing starts for Building 1.
Building 1 shell and cooling looks complete, but construction equipment still seen around cooling and building. We estimate another 4 months to operational.
Building 1 is operational (estimate).
Read more about our methodology.