Eagle Mountain, Utah, United States
Meta Eagle Mountain is an operational AI data center with AI chips owned and used by Meta. It hosts an estimated 151k H100-equivalents of compute, supported by 133 MW of IT power at a capital cost of $5.0 B. We estimate that it uses Nvidia B300 chips.
The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, regulatory filings, and chip availability.

Satellite imagery
CURRENT COMPUTE
151kH100-eq
3.00e208-bit OP/s
CURRENT IT POWER
133MW
PROJECTED IT POWER
133MW
CURRENT COST
$5.0B
PROJECTED COST
$5.0B
Land clearing begins.
We believe Buildings 1 and 2 are still undergoing testing due to construction equipment and unfinished land surrounding the data center sites, as well as color motion artifacts on a small number of the cooling fans.
Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.
Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances.