Updated Jul. 25, 2026

CoreWeave Marble NC

Marble, North Carolina, United States

CoreWeave Marble NC is an operational AI data center with AI chips owned by CoreWeave and used by OpenAI (speculative). It hosts an estimated 79k H100-equivalents of compute, supported by 65 MW of IT power at a capital cost of $2.5 B. We estimate that it uses Nvidia B200 chips.

The timeline of IT power and compute capacity is based on satellite imagery and company disclosures.

Marble is a former crypto-mining facility that Core Scientific converted to dense GPU hosting, handing the full contracted 65 MW to CoreWeave by May 2026.

OWNER CoreWeave STATUS Operational USER OpenAI
Show compute as
Satellite view of CoreWeave Marble NC

Satellite imagery

Latest: Apr. 17, 2026 · 1 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

79k H100-eq

1.56e20 8-bit OP/s

CURRENT IT POWER

65 MW

PROJECTED IT POWER

65 MW

CURRENT COST

$2.5 B

PROJECTED COST

$2.5 B

HardwareNvidia B200

CoolingAir-cooled chiller

Buildout

Jun 25, 20240K H100e
Jun 25, 2024

Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.

Mar 2, 2026

Marble had achieved full site energization. Two of three data halls had been delivered at 36 billable MW, supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning.

Compute
43kH100-eq
IT Power
36MW
Cost
$1.4B
Apr 17, 2026

Satellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state.

Compute
43kH100-eq
IT Power
36MW
Cost
$1.4B
May 6, 2026

Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.

Compute
79kH100-eq
IT Power
65MW
Cost
$2.5B

Sources

  1. Core Scientific - Q1 2026 Fiscal Earnings Call
  2. Core Scientific - Official Marble, NC Datacenter page
  3. Core Scientific - Q1 2025 Earnings Presentation
  4. Core Scientific - June 2024 Investor and Analyst Day

Read more about our methodology.