Core42 Lake Mariner

Barker, New York, United States

Core42 Lake Mariner is an operational AI data center with AI chips owned by Core42 and likely used by G42. It hosts an estimated 72k H100-equivalents of compute, supported by 58 MW of IT power at a capital cost of $2.2 B. We estimate that it uses Nvidia B200 chips.

The timeline of IT power and compute capacity is based on satellite imagery, our cooling equipment power model, company disclosures, chip availability, and chip efficiency.

OWNERCore42STATUSOperationalUSERG42 (likely)
Show compute as
Satellite view of Core42 Lake Mariner

Satellite imagery

Latest: Jul. 24, 2026 · 2 high-res images
View satellite explorer →

Scale & specifications

CURRENT COMPUTE

72kH100-eq

1.42e208-bit OP/s

CURRENT IT POWER

58MW

PROJECTED IT POWER

58MW

CURRENT COST

$2.2B

PROJECTED COST

$2.2B

Buildout

Oct 1, 20240K H100e
Oct 1, 2024

Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.

Oct 1, 2025

Building 1 is operational. Based on Terawulf saying "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was said to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

Compute
20kH100-eq
IT Power
16MW
Cost
$0.6B
Mar 2, 2026

Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's statement that CB2B is expected in March 2026, and is likely still in commissioning phase.

Compute
20kH100-eq
IT Power
16MW
Cost
$0.6B
Mar 31, 2026

Building 2 is operational. On February 26, Terawulf stated that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from RAAD showed no cooling fan movement on May 8th, suggesting it was not in use. This building is leased to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.

Compute
72kH100-eq
IT Power
58MW
Cost
$2.2B
Jul 23, 2026

Both buildings still operational according to satellite imagery.

Compute
72kH100-eq
IT Power
58MW
Cost
$2.2B

Sources

  1. Terawulf press release with details of Core42 lease for Buildings 1-2
  2. Terawulf press release with details and timeline for Buildings 1-5
  3. DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner
  4. Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York

View our calculations for this data center, or read more about our methodology.