CONSTRUCTION STATUS
Mar 15, 2026

Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buldings to the north. Meta announced the arrival of the first server rack the following week.

Compute
0H100-eq
IT Power
0MW
Cost
$0.0B
Building
Substation
On-site power
Backup power