2026202520242023
Microsoft Fairwater AtlantaFayetteville, Georgia, United States
OWNERMicrosoft
USEROpenAI
Full details →

CONSTRUCTION STATUS
May 15, 2026

Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those.

Compute
374kH100-eq
IT Power
321MW
Cost
$12.2B
Building
Grid power
On-site power
Backup power
Cooling