2027202620252024
CoreWeave Denton TXDenton, Texas, United States
OWNERCoreWeave
USEROpenAI
Full details →

CONSTRUCTION STATUS
Jul 3, 2026

Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.

Compute
253kH100-eq
IT Power
262MW
Cost
$9.9B
Building
Substation
On-site power
Backup power
Cooling