202620252024
Colossus 1Memphis, Tennessee, United States
OWNERSpaceXAI
USERAnthropic
Full details →

CONSTRUCTION STATUS
Feb 11, 2026

All air-cooled chillers have been disconnected and/or removed from the site, leaving only the cooling towers for cooling. The third substation looks complete, with red cables connected to the building.

Compute
276kH100-eq
Power
425MW
Cost
$12.9B
Building
Grid power
On-site power
Backup power
Cooling