202720262025
Anthropic Lake MarinerBarker, New York, United States
OWNERAI XPV Platform
USERAnthropic
Full details →

CONSTRUCTION STATUS
Jul 23, 2026

Building 1 looks complete, consistent with it going operational back in May. Building 2 is mostly complete, with the row of backup generators on the east side of the building still being installed. Building 3 shell is complete, with rooftop coolers midway through installation, and no neighboring generators installed/visible yet.

Compute
59kH100-eq
IT Power
42MW
Cost
$1.6B
Building
Substation
On-site power
Backup power
Cooling